Who This Checklist Is For
-
Step 1: Lock the Spec Sheet Before You Talk Price
-
Step 2: Verify the Factory, Not the Website
-
Step 3: Run a Tolerance and Repeatability Test on a Sample
-
Step 4: Map Every Manual Touchpoint They Didn't Mention
-
Step 5: Get Written Delivery Certainty—Not a Verbal "Should Be Fine"
-
Step 6: Confirm Spare Parts and Support Response Time
-
Step 7: Do a Pre-Ship Acceptance Test at Their Facility
-
Common Mistakes to Avoid
-
A Note on Timing
Who This Checklist Is For
This is for the person who has to sign off on an automated assembly line before it ships—and who lives with the consequences if it doesn't perform. Procurement managers, quality engineers, plant operations leads. If you're sourcing from an automated assembly line manufacturer or evaluating a turnkey fully automated assembly line, these seven steps are the ones I run every time. I don't skip them. The one time I skipped step five, we ate a $22,000 rework bill.
Total steps: seven. Realistic time if you're doing it properly: 4–6 weeks from first quote to signed PO. If a vendor tells you it can be done in ten days, that's your first red flag.
Step 1: Lock the Spec Sheet Before You Talk Price
Most buyers do this backwards. They get a number, then negotiate scope down to fit the number. That's how you end up with a "fully automated" line that has three manual stations tucked in because nobody wrote down what "fully" meant.
Write the spec first. Cycle time target, changeover time, throughput at 85% OEE, reject rate ceiling, required certifications (CE, UL, ISO 9001 at minimum), footprint constraints, and the exact upstream/downstream interfaces. I want to say we ran 14 pages on our last one—it was probably closer to 20, I'd have to pull the file.
Checkpoint: Can your maintenance lead read the spec and tell you which spare parts will be non-standard? If not, the spec isn't done.
Step 2: Verify the Factory, Not the Website
An automated assembly line factory and a trading company with a nice landing page look identical online. They are not the same thing, and the delta shows up in month three when you need a firmware update.
Ask for: business license and manufacturing permit, the actual assembly floor address (not a registered office), photos with a timestamp and a part you recognize in frame, and two customer references in your or an adjacent industry. Call the references. Ask what broke and how fast the vendor responded. If they hesitate on that second question, keep shopping.
Checkpoint: If they won't do a live video walk of the floor during your call, that's not a scheduling problem. That's an answer.
Step 3: Run a Tolerance and Repeatability Test on a Sample
This is the step most buyers skip, and it's the one that costs the most when it goes wrong.
Send a batch of your actual parts—not the vendor's demo parts—and have them run a 200-cycle test. Measure the output against your spec, not theirs. Ask for the raw data, not a summary. I've seen vendors report "within tolerance" when the measurement was 0.4mm against a 0.2mm spec on the grounds that "industry standard is looser." It isn't. Our spec was our spec.
Checkpoint: Get the raw measurement data in a spreadsheet. If you're handed a PDF summary, ask again.
Step 4: Map Every Manual Touchpoint They Didn't Mention
"Fully automated" has a looser definition in sales decks than on the floor. Ask them to walk you through a full shift: who loads raw material, who clears jams, who does end-of-shift cleanup, who changes tooling.
Count the manual interventions. Multiply by your labor cost and your shift count. That's the true cost of the "fully automated" line you're about to buy. Sometimes the number is fine. Sometimes it isn't. Either way, you now know what you're actually signing for.
Checkpoint: If they can't name the manual touchpoints, they haven't thought about integration with your existing floor.
Step 5: Get Written Delivery Certainty—Not a Verbal "Should Be Fine"
I knew I should get the deadline in writing, but we'd worked with the vendor before and I figured a handshake was fine. That was the one time the verbal agreement got "forgotten" and the line shipped six weeks late. Missing our launch window cost us more than the entire line.
Since then, every contract includes: a liquidated damages clause tied to delivery date, a defined acceptance test with pass/fail criteria, and a milestone payment schedule where at least 30% is held until the acceptance test passes on your floor. Not on theirs. Yours.
Checkpoint: If the vendor won't sign a delivery guarantee, ask why. There's usually a real reason, and you want to hear it now, not in month four.
Step 6: Confirm Spare Parts and Support Response Time
A fully automated assembly line that's down for three days because a servo drive has to ship from overseas isn't automated. It's expensive manual labor with extra steps.
Get in writing: the spare parts list with lead times, whether critical components are stocked locally or regionally, the support response SLA (mine is 4-hour response, next-business-day on-site for critical faults), and the firmware/software update policy. Ask what happens when the original PLC model is discontinued. If the answer is "we'll figure it out," that's not a plan.
Checkpoint: Walk the spare parts list against your own maintenance inventory. What do you already have? What do you need to stock?
Step 7: Do a Pre-Ship Acceptance Test at Their Facility
Before the line is crated, go see it run. Bring your own operator if you can. Run your parts, at your cycle time, for at least one full shift. Document any deviation in writing, and hold final payment until those deviations are resolved.
The surprise wasn't the price difference between the two vendors we shortlisted. It was how much cleaner the pre-ship test went with the one that cost 12% more. Fewer surprises on their floor means fewer surprises on yours. That 12% was, in hindsight, the cheapest insurance policy we've ever bought.
Checkpoint: No pre-ship test, no final payment. Write it into the PO.
Common Mistakes to Avoid
- Negotiating price before locking scope. You'll get the price down, and you'll get a different machine than you thought.
- Trusting a client logo wall. Ask for contact names and call them.
- Skipping the sample test to save two weeks. The two weeks you save will be spent on rework.
- Accepting "industry standard" as a spec. Your standard is the only one that matters on your floor.
- Verbal delivery promises. If it isn't in the contract, it doesn't exist.
None of this is glamorous. But the buyers who run these seven steps are the ones who don't end up on a call with me six months later, explaining why the "fully automated" line still needs three people per shift.
A Note on Timing
If your project has a hard deadline—a product launch, a contract with a penalty clause, a seasonal window—budget for delivery certainty, not just delivery speed. I'd argue the premium you pay for a guaranteed date is almost always cheaper than the cost of missing it. After getting burned twice by "probably on time" promises, we now build guaranteed delivery into the sourcing budget from day one. That's not a sales pitch. That's just what the last four years have taught me.